Restarting after a complete shutdown Once the UPS is running, and everything is plugged in and turned on in the UPS room (except the white breaker and RA+DEC enable switches which could wait until later), go up to the dome: - turn on the red main power button (upper right on the telescope console) - turn on the telescope power (lower right on the telescope console); you should hear the filter wheel repositioning) - turn on the 4kccd power switch and the controller switch (gray box mounted on the N side of the guider box) - turn on the the power switch to the guider/filter boxes (on SW corner of guider box) - turn on shutter box (gray box mounted on NW corner of the guider box) - turn on CCD guider/controller (blue box mounted on the S side of the guider box) and the CCD guider cooler (black box located at the SW corner of the guider box) In the warm room: Plug in and turn on the computers: - turn on the TCS computer (green switch just inside the black cover on the right side of the telescope console) - turn on the NBS switch (top right of the telescope console) - plug in the two power cords for kuiper and its monitors in the second pair of orange outlets, and push the button to start kuiper rebooting - plug in the black and white twistlock connector for the printer in the "dirty power" outlet - plug in the gray power cord for the bigccd power strip and turn on the power strip - plug in, turn on, and boot bigag Logon and get started: - log on to the TCS computer; hit for the password; when you get the windows desktop, double click on "TCS150" icon; hit once or twice until the TCS program is running - start the Telcom server on bigag (Telcom150 icon on the computer desktop); when the Telcom window comes up, you can type - if it's working, you can see the data stream from the telescope. The Telcom Server allows bigccd to access the telescope information, so that it can go in the image headers. The Telcom Server needs three things in order to work: 1) internet connection - the cable with phone-type connectors from the back of the bigag computer to the DHCP connection on the wall behind bigag 2) TCS must be running 3) TCS connector (gray 9-pin connector connected to a thin gray cable that snakes off towards the TCS behind all the other computers) must be plugged into the back of bigag just below where the small round purple connection to the keyboard plugs in. - log on to kuiper (see the kuiper login instruction pages), and make sure that the dataserver, galilserver, and filter wheel processes are all running properly - start up the BigGuider autoguider system by clicking on the "Start BigGuider" icon on the bigag desktop. - press the button on the front of the bigccd computer to start it rebooting; AZCamServer should start automatically. Once AZCamServer is going with no complaints, double-click on the AZCamTool icon at the top right; this should do a ccd reset (if the 4kccd power switch and controller are turned on) and will then be ready to use. Check the time on bigccd; this should be the time from the GPS server, but after a cold start, it won't have had time to synchronize. Double click on the digital clock in the lower left corner, and compare the time with the time on the NBS clock. If detectably different, click "OK" to close the time window. Right-click on the tiny yellow rectangle-on-a-stand to the left of the digital clock (you might need to click first on the < to show hidden icons), then click on "properties" at the bottom, and then on "Sync" at the top middle. Click "Close" to get out (NOT "Exit"!), and recheck the synchronization of the digital clock with the NBS, which should be good to better than one second.